patching...
Welcome back, Patch Blogger!

Kirkwood Road Closings Friday Feb 24

ALFRED AND CLAY LANE CLOSURES, FEBRUARY 24:  Holloran Contracting will be doing street repairs at these locations from water main breaks:   427 Alfred - lane closed until 3:30; Clay at Avery – lane closed 8:30 to 3:30; Clay at Way – lane closed from 9:30 to 3:30.   The contractor will set up and maintain all traffic control for the lane closures

Leave a comment