ALFRED AND CLAY LANE CLOSURES, FEBRUARY 24: Holloran Contracting will be doing street repairs at these locations from water main breaks: 427 Alfred - lane closed until 3:30; Clay at Avery – lane closed 8:30 to 3:30; Clay at Way – lane closed from 9:30 to 3:30. The contractor will set up and maintain all traffic control for the lane closures